South Melbourne Market

South Melbourne Market, City of Port Phillip

Solar PV, Battery Storage

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

Key Achievements:

  • Scoping, feasibility and financial modelling of solar 400kW, battery, embedded network and Electric Vehicle charging.
  • Management of structural approval, roof safety equipment and building permits.
  • Post installation auditing and defect management.

Impact

Technical design file of a solar and smart energy system.

Project Scope

  • Scoping, feasibility and financial modelling of solar 400kW, battery, embedded network and Electric Vehicle charging.
  • Concept design and preliminary grid connection application.
  • Management of structural approval, roof safety equipment and building permits.
  • Tender documentation, management and evaluation.
  • Owners engineers and project management.
  • Post installation auditing and defect management.
  • Performance monitoring.

Project Details

  • 247kW commissioned in August 2020.
  • System integration with Fire Alarm and smaller legacy PV system.
  • Significant roof safety equipment upgrade including walkways, stairs and skylight protection.
  • Provides optimum solar self consumption of council loads at the market.
  • Performance guaranteed.
A man working on electrical schematics at an ergonomic desk
A man working on solar panels on a roof

Project Challenges

  • Safe roof hardware compliance and ensuring the roof and PV system can be safely accessed following solar installation.
  • Complex roof areas, electrical networks and grid protection controls.
  • Oversight of solar contractor to ensure safety, quality and communication..
  • Engagement and communication with various stakeholders of a busy public marketplace.
  • Building permits.

Need advice on a project?