Completed commercial and utility projects.

1000's of successful projects delivered.

Enhar is proud to have worked with leading universities, governments, project developers and private companies around Australia to de-risk complex projects and raise the standard through excellence in project development, engineering, procurement and quality management.

Birds eye view of solar panels and energy generation on large rooftops
University of Melbourne logo
Logo hepburn windLogo bendigo

Projects We're Proud Of

We have worked with universities, councils, business and project developers to deliver feasibility, tendering, design, planning, grid connection and quality management to their solar projects.

Solar PV, Battery Storage

South Melbourne Market, City of Port Phillip

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

View Project ->
Solar Farm

Independent Engineer: 14.5MW solar, 4MW BESS

Independent review of project engineering and construction quality through to commissioning phases. Site inspections and defects reporting.

View Project ->
Solar design and grid approval

Water Authority 770kW Ground Mount

Detailed design and grid connection management for 770kW solar PV system across three Water Treatment Plants.

View Project ->
Solar PV Owners Engineer

4.5MW rooftop solar and carports

Owners Engineer for Solar Programs: rooftop, ground mount and carports. Feasibility, procurement management, quality control, superintendent

View Project ->
Solar J

Zero Net Energy Town

Creating Australia’s first town which satisfies all of its own energy needs from renewable energy sources.

View Project ->
Solar PV, Battery Storage

South Melbourne Market, City of Port Phillip

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

View Project ->
Solar design and grid approval

Water Authority 770kW Ground Mount

Detailed design and grid connection management for 770kW solar PV system across three Water Treatment Plants.

View Project ->
Solar PV Owners Engineer

4.5MW rooftop solar and carports

Owners Engineer for Solar Programs: rooftop, ground mount and carports. Feasibility, procurement management, quality control, superintendent

View Project ->
Solar Design and grid approval

Clayton 1.01MW roof top solar, United Energy

Detailed design and grid connection management for 1.01MW solar PV system. 5 LV connection points on a HV supply.

View Project ->
Solar Owner Engineer

Solar PV Program (>3MW)

Owners Engineer for UoM >3MW solar program since 2015. Feasibility, design, tender management, quality assurance and asset management.

View Project ->
Solar Farm

University campus solar farm

Solar farm specifications, project coordination and grid connection modelling.

View Project ->
Solar Farm

40MW solar with 40MW/80MWh battery, Queensland

View Project ->
Visual assessment for planning permit

Hepburn Energy - visual assessment for hybrid solar and battery planning permit

Community Solar farm required visual assessment to support its planning permit and community engagement.

View Project ->
Solar Farm

Business case for large battery addition to 40MW solar farm

Modelling financial viability of large scale storage for arbitrage and FCAS.

View Project ->
Solar PV Owners Engineer

City of Darebin 850kW Solar and Energy storage

Feasibility, Tender design, owners engineer, compliance and owners engineer. 850kW solar and 110kWh of energy storage.

View Project ->

Commercial

Solar PV

Core Complex 200kW Rooftop Solar

Port Melbourne 200kW rooftop solar with 14 x new NMI meters.

View Project ->

Commercial

Solar PV

Southwestern Hospitals 1.5MW rooftop solar

Detail design for 1.5MW PV systems for Hospitals in South West Victoria.

View Project ->

Commercial

Solar

Mallacoota Renewable Energy Feasibility Study

Using a renewable energy hybrid system to provide reliable uninterruptible power for the town of Mallacoota.

View Project ->

Commercial

Solar & Battery

Community Bank Stadium Battery Optimisation study

View Project ->

Commercial

Knox City Council 4.99MW Landfill Solar Farm

View Project ->

Commercial

Solar J

Zero Net Energy Town

Creating Australia’s first town which satisfies all of its own energy needs from renewable energy sources.

View Project ->

Commercial

Solar PV, Battery Storage

South Melbourne Market, City of Port Phillip

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

View Project ->

1

Commercial

Solar Farm

Independent Engineer: 14.5MW solar, 4MW BESS

Independent review of project engineering and construction quality through to commissioning phases. Site inspections and defects reporting.

View Project ->

1

Utility

Solar design and grid approval

Water Authority 770kW Ground Mount

Detailed design and grid connection management for 770kW solar PV system across three Water Treatment Plants.

View Project ->

2

Commercial

Solar PV Owners Engineer

4.5MW rooftop solar and carports

Owners Engineer for Solar Programs: rooftop, ground mount and carports. Feasibility, procurement management, quality control, superintendent

View Project ->

2

Commercial

Solar Design and grid approval

Clayton 1.01MW roof top solar, United Energy

Detailed design and grid connection management for 1.01MW solar PV system. 5 LV connection points on a HV supply.

View Project ->

3

Commercial

Solar Farm

Maintenance audit of 60MW solar farm

Enhar undertook a maintenance review of a remote 60MW solar farm in a dusty environment in Western Australia.

View Project ->

3

Utility

Council Landfill Solar Farm Feasibility

Yarra Ranges Council 4.5MW Solar Landfill Feasibility

Solar landfill feasibility study exploring how to transform unproductive land near landfill sits into renewable energy solar farms.

View Project ->

4

Utility

Solar Owner Engineer

Solar PV Program (>3MW)

Owners Engineer for UoM >3MW solar program since 2015. Feasibility, design, tender management, quality assurance and asset management.

View Project ->

4

Commercial

Battery Storage

Electrical design of 2 x 5MW batteries on Tonga

Detailed electrical design of LV and MV components of BESS systems.

View Project ->

5

Utility

Solar Farm

400MW Solar farm design and planning permit

400MW Solar farm design and planning permit.

View Project ->

5

Utility

EV Charging

EV infrastructure feasibility modelling and design

EV Charging Infrastructure feasibility, fleet modelling and detailed design. Depot 112 Vehicles, Civic Centre 39 Vehicles.

View Project ->

5

Commercial

Battery Storage

4.9MW Longwarry battery land and planning permit

Winning a non-network solution EOI, securing land and planning permit.

View Project ->

6

Utility

Solar Farm

University campus solar farm

Solar farm specifications, project coordination and grid connection modelling.

View Project ->

6

Utility

Solar Maintenace Auditing

Condition, safety and performance auditing.

Condition, safety and performance auditing on 25 commercial solar PV systems, including creating a detailed asset register.

View Project ->

8

Commercial

Solar PV Owners Engineer

Brisbane Convention & Exhibition Centre 309kW

Feasibility, tender design, grid approvals and compliance engineer, for high profile inner city buiding.

View Project ->

9

Commercial

EV Charging

EV Infrastructure Feasibility for Residential Stata Buildings

30 EV Charging Infrastructure Feasibility assessments for apartment buildings with up to 350 spaces, for facility/owners corporations.

View Project ->

9

Commercial

Solar Hybrid

Standalone Power System design for Telecom Sites

Site assessment, load modelling and detailed 'for construction' design of solar battery diesel for 50+ telecom sites.

View Project ->

10

Commercial

Embedded Network Feasibility for the City of Greater Bendigo

Establishing regulatory, technical and financial viability of a smart embedded network.

View Project ->

10

Commercial

Solar Hybrid

LHAC: 6 Aboriginal Homeland Communities

Containerised Solar Diesel Hybrid System optimisation and design for 8 Aboriginal homeland communities in North East Arnhem Land and Kakadu.

View Project ->

11

Commercial

Solar PV Owners Engineer

Private hospital solar rollout (national)

Feasibility, detailed design, tender management and owners engineer for hospital sites in Vic, WA and NSW.

View Project ->

12

Commercial

Solar PV, Energy Storage, EV Chargers

Owners Engineer Solar PV, Battery & EV

Working with Nillumbik Shire Council to deliver solar PV with storage and EV chargers, from feasibility to final commissioning.

View Project ->

12

Commercial

Solar Farm

40MW solar with 40MW/80MWh battery, Queensland

View Project ->

13

Utility

Solar Hybrid Detail Design

Cardinia Childcare: Solar PV and BESS

Detailed design and Grid connection management for 2 x 100kW rooftop solar and 180kW/hr/90kW flow batteries.

View Project ->

13

Commercial

Visual assessment for planning permit

Hepburn Energy - visual assessment for hybrid solar and battery planning permit

Community Solar farm required visual assessment to support its planning permit and community engagement.

View Project ->

14

Utility

Solar Farm

Business case for large battery addition to 40MW solar farm

Modelling financial viability of large scale storage for arbitrage and FCAS.

View Project ->

14

Utility

Solar PV detail design and grid connection

Solar PV at school with complex wireless interlock

Creekside College 100kW rooftop solar with wireless interlock.

View Project ->

17

Commercial

Commercial Power System Design for Jemena Sites

Detailed design 'for construction' and ‘as built’ of solar sites. Grid connection approvals.

View Project ->

90

Commercial

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
South Melbourne Market, City of Port Phillip
Solar PV, Battery Storage
South Melbourne Market

South Melbourne Market, City of Port Phillip

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

View Project ->
Independent Engineer: 14.5MW solar, 4MW BESS
Solar Farm
Private Entity

Independent Engineer: 14.5MW solar, 4MW BESS

Independent review of project engineering and construction quality through to commissioning phases. Site inspections and defects reporting.

View Project ->
Water Authority 770kW Ground Mount
Solar design and grid approval
Water Authority

Water Authority 770kW Ground Mount

Detailed design and grid connection management for 770kW solar PV system across three Water Treatment Plants.

View Project ->
4.5MW rooftop solar and carports
Solar PV Owners Engineer
Latrobe University

4.5MW rooftop solar and carports

Owners Engineer for Solar Programs: rooftop, ground mount and carports. Feasibility, procurement management, quality control, superintendent

View Project ->
Clayton 1.01MW roof top solar, United Energy
Solar Design and grid approval
Enervest

Clayton 1.01MW roof top solar, United Energy

Detailed design and grid connection management for 1.01MW solar PV system. 5 LV connection points on a HV supply.

View Project ->
Maintenance audit of 60MW solar farm
Solar Farm
Alinta Energy

Maintenance audit of 60MW solar farm

Enhar undertook a maintenance review of a remote 60MW solar farm in a dusty environment in Western Australia.

View Project ->
Yarra Ranges Council 4.5MW Solar Landfill Feasibility
Council Landfill Solar Farm Feasibility
Yarra Ranges Council

Yarra Ranges Council 4.5MW Solar Landfill Feasibility

Solar landfill feasibility study exploring how to transform unproductive land near landfill sits into renewable energy solar farms.

View Project ->
Solar PV Program (>3MW)
Solar Owner Engineer
Melbourne University

Solar PV Program (>3MW)

Owners Engineer for UoM >3MW solar program since 2015. Feasibility, design, tender management, quality assurance and asset management.

View Project ->
Electrical design of 2 x 5MW batteries on Tonga
Battery Storage
Akuo

Electrical design of 2 x 5MW batteries on Tonga

Detailed electrical design of LV and MV components of BESS systems.

View Project ->
400MW Solar farm design and planning permit
Solar Farm
Private Client

400MW Solar farm design and planning permit

400MW Solar farm design and planning permit.

View Project ->
EV infrastructure feasibility modelling and design
EV Charging
Moonee Valley City Council

EV infrastructure feasibility modelling and design

EV Charging Infrastructure feasibility, fleet modelling and detailed design. Depot 112 Vehicles, Civic Centre 39 Vehicles.

View Project ->
4.9MW Longwarry battery land and planning permit
Battery Storage
Gransolar Group

4.9MW Longwarry battery land and planning permit

Winning a non-network solution EOI, securing land and planning permit.

View Project ->
University campus solar farm
Solar Farm
Leading University

University campus solar farm

Solar farm specifications, project coordination and grid connection modelling.

View Project ->
Condition, safety and performance auditing.
Solar Maintenace Auditing
Deakin University

Condition, safety and performance auditing.

Condition, safety and performance auditing on 25 commercial solar PV systems, including creating a detailed asset register.

View Project ->
Brisbane Convention & Exhibition Centre 309kW
Solar PV Owners Engineer
Brisbane Convention & Exhibition Centre

Brisbane Convention & Exhibition Centre 309kW

Feasibility, tender design, grid approvals and compliance engineer, for high profile inner city buiding.

View Project ->
EV Infrastructure Feasibility for Residential Stata Buildings
EV Charging
Residential Strata Managers

EV Infrastructure Feasibility for Residential Stata Buildings

30 EV Charging Infrastructure Feasibility assessments for apartment buildings with up to 350 spaces, for facility/owners corporations.

View Project ->
Standalone Power System design for Telecom Sites
Solar Hybrid
Telecom

Standalone Power System design for Telecom Sites

Site assessment, load modelling and detailed 'for construction' design of solar battery diesel for 50+ telecom sites.

View Project ->
LHAC: 6 Aboriginal Homeland Communities
Solar Hybrid
North East Arnhem Land

LHAC: 6 Aboriginal Homeland Communities

Containerised Solar Diesel Hybrid System optimisation and design for 8 Aboriginal homeland communities in North East Arnhem Land and Kakadu.

View Project ->
Private hospital solar rollout (national)
Solar PV Owners Engineer
Private Hospitals

Private hospital solar rollout (national)

Feasibility, detailed design, tender management and owners engineer for hospital sites in Vic, WA and NSW.

View Project ->
Owners Engineer Solar PV, Battery & EV
Solar PV, Energy Storage, EV Chargers
ELC and DVFC, Nillumbik Shire Council

Owners Engineer Solar PV, Battery & EV

Working with Nillumbik Shire Council to deliver solar PV with storage and EV chargers, from feasibility to final commissioning.

View Project ->
40MW solar with 40MW/80MWh battery, Queensland
Solar Farm
Bundaberg

40MW solar with 40MW/80MWh battery, Queensland

View Project ->
Cardinia Childcare: Solar PV and BESS
Solar Hybrid Detail Design
Cardinia Childcare

Cardinia Childcare: Solar PV and BESS

Detailed design and Grid connection management for 2 x 100kW rooftop solar and 180kW/hr/90kW flow batteries.

View Project ->
Hepburn Energy - visual assessment for hybrid solar and battery planning permit
Visual assessment for planning permit
Hepburn Community Energy

Hepburn Energy - visual assessment for hybrid solar and battery planning permit

Community Solar farm required visual assessment to support its planning permit and community engagement.

View Project ->
Business case for large battery addition to 40MW solar farm
Solar Farm
Solar Farm Owner

Business case for large battery addition to 40MW solar farm

Modelling financial viability of large scale storage for arbitrage and FCAS.

View Project ->
Solar PV at school with complex wireless interlock
Solar PV detail design and grid connection
Creekside College

Solar PV at school with complex wireless interlock

Creekside College 100kW rooftop solar with wireless interlock.

View Project ->
Commercial Power System Design for Jemena Sites
Jemena

Commercial Power System Design for Jemena Sites

Detailed design 'for construction' and ‘as built’ of solar sites. Grid connection approvals.

View Project ->
Solar PV, Battery Storage

South Melbourne Market, City of Port Phillip

Feasibility (Solar, Battery, Embedded Network, EV), tender design, grid approval and owners engineer.

View Project ->
Solar design and grid approval

Water Authority 770kW Ground Mount

Detailed design and grid connection management for 770kW solar PV system across three Water Treatment Plants.

View Project ->
Solar PV Owners Engineer

4.5MW rooftop solar and carports

Owners Engineer for Solar Programs: rooftop, ground mount and carports. Feasibility, procurement management, quality control, superintendent

View Project ->
Solar Design and grid approval

Clayton 1.01MW roof top solar, United Energy

Detailed design and grid connection management for 1.01MW solar PV system. 5 LV connection points on a HV supply.

View Project ->
Solar Owner Engineer

Solar PV Program (>3MW)

Owners Engineer for UoM >3MW solar program since 2015. Feasibility, design, tender management, quality assurance and asset management.

View Project ->
EV Charging

EV infrastructure feasibility modelling and design

EV Charging Infrastructure feasibility, fleet modelling and detailed design. Depot 112 Vehicles, Civic Centre 39 Vehicles.

View Project ->
Solar Maintenace Auditing

Condition, safety and performance auditing.

Condition, safety and performance auditing on 25 commercial solar PV systems, including creating a detailed asset register.

View Project ->
Solar PV Owners Engineer

Brisbane Convention & Exhibition Centre 309kW

Feasibility, tender design, grid approvals and compliance engineer, for high profile inner city buiding.

View Project ->
EV Charging

EV Infrastructure Feasibility for Residential Stata Buildings

30 EV Charging Infrastructure Feasibility assessments for apartment buildings with up to 350 spaces, for facility/owners corporations.

View Project ->
Solar Hybrid

Standalone Power System design for Telecom Sites

Site assessment, load modelling and detailed 'for construction' design of solar battery diesel for 50+ telecom sites.

View Project ->

Embedded Network Feasibility for the City of Greater Bendigo

Establishing regulatory, technical and financial viability of a smart embedded network.

View Project ->
Solar Hybrid

LHAC: 6 Aboriginal Homeland Communities

Containerised Solar Diesel Hybrid System optimisation and design for 8 Aboriginal homeland communities in North East Arnhem Land and Kakadu.

View Project ->
Solar PV Owners Engineer

Private hospital solar rollout (national)

Feasibility, detailed design, tender management and owners engineer for hospital sites in Vic, WA and NSW.

View Project ->
Solar PV, Energy Storage, EV Chargers

Owners Engineer Solar PV, Battery & EV

Working with Nillumbik Shire Council to deliver solar PV with storage and EV chargers, from feasibility to final commissioning.

View Project ->
Solar Hybrid Detail Design

Cardinia Childcare: Solar PV and BESS

Detailed design and Grid connection management for 2 x 100kW rooftop solar and 180kW/hr/90kW flow batteries.

View Project ->
Solar PV detail design and grid connection

Solar PV at school with complex wireless interlock

Creekside College 100kW rooftop solar with wireless interlock.

View Project ->

Commercial Power System Design for Jemena Sites

Detailed design 'for construction' and ‘as built’ of solar sites. Grid connection approvals.

View Project ->
Solar Farm

Independent Engineer: 14.5MW solar, 4MW BESS

Independent review of project engineering and construction quality through to commissioning phases. Site inspections and defects reporting.

View Project ->
Solar Farm

Maintenance audit of 60MW solar farm

Enhar undertook a maintenance review of a remote 60MW solar farm in a dusty environment in Western Australia.

View Project ->
Council Landfill Solar Farm Feasibility

Yarra Ranges Council 4.5MW Solar Landfill Feasibility

Solar landfill feasibility study exploring how to transform unproductive land near landfill sits into renewable energy solar farms.

View Project ->
Battery Storage

Electrical design of 2 x 5MW batteries on Tonga

Detailed electrical design of LV and MV components of BESS systems.

View Project ->
Solar Farm

400MW Solar farm design and planning permit

400MW Solar farm design and planning permit.

View Project ->
Battery Storage

4.9MW Longwarry battery land and planning permit

Winning a non-network solution EOI, securing land and planning permit.

View Project ->
Solar Farm

University campus solar farm

Solar farm specifications, project coordination and grid connection modelling.

View Project ->
Solar Farm

40MW solar with 40MW/80MWh battery, Queensland

View Project ->
Visual assessment for planning permit

Hepburn Energy - visual assessment for hybrid solar and battery planning permit

Community Solar farm required visual assessment to support its planning permit and community engagement.

View Project ->
Solar Farm

Business case for large battery addition to 40MW solar farm

Modelling financial viability of large scale storage for arbitrage and FCAS.

View Project ->